Anova Integrated Systems Ltd
Anova Limited Anova Limited Anova Limited Anova Limited Anova Limited
 

 

Anova Integrated Systems Limited | Projects

In the recent times we have been involved in designing and installation of solar street lights in various part of the country. As our usual practice, we ensure that materials used for our installations are of high quality. We do not compromise quality in our installations and as a result, we have been able to build confidence in the renewable energy industry.

Below are some projects we have undertaken in the past:



Selected Projects

  • SOLAR STREET LIGHT PROJECT

In the past years we have worked so much by putting smiles into the faces of our rural dwellers through community rural electrification projects. Places that were yet to be linked with the national grid had been illuminated with our renewable power generation and distribution. Our other major area of activity is the installation of solar streetlights of different design and specifications.

Many communities in the Ijaw area of the Niger-Delta states had been powered by us through installations of solar streetlights. Some of these communities include, Patani, Bomadi and the Isoko region.

We are sub-contractor to Nigerian Energy Commission (ECN), Niger Delta Development Commission (NDDC) and many other bodies such as MPP6, MPP9 the European Union and Federal Government assisted projects to develop the Niger Delta States.



Stand Alone Solar Street light Installation in Patani Delta State.

 

  • SOLAR WATER PROJECT

At Anova Solar, we also specialized in installation of standard solar water borehole systems. We carry out geological survey of the proposed site to know the water level before embarking on the borehole digging proper. We make use of the best equipment for solar water system. We are one of the renowned major distributors of groundfos solar pumps in Nigeria and sub-west African region.

Our technical installers were properly trained in designing and installation of solar pumps and all types of electrical control switches. We have well experienced metal/steel fabricators to perfectly handle station, build water tanks of any capacity.

The pictures show one of our installation sites in Delta State of Nigeria.